About Pioneer

Pioneer Power Solutions, Inc. manufactures, sells and services a broad range of specialty electrical transmission, distribution and on-site power generation equipment for applications in the utility, industrial, commercial and backup power markets.

Pioneer is headquartered in Fort Lee, New Jersey and operates from three additional locations in the U.S. for manufacturing, service and maintenance, engineering, sales and administration.

 

Pioneer Power Mobility

As EV adoption grows, utilities and other power generators must grapple with the issue of determining the volume, time of day, and location where electricity will be needed. But, as recent events have demonstrated, atypical and extreme weather patterns make predictions more difficult, affect resiliency and reliability of grid-dependent needs, and create vulnerabilities for end users.

Pioneer Power Mobility is charging the EV frontier. Whether an electric vehicle is driving on a country road, back road, or off-road, Pioneer Power Mobility ensures that an EV charge is always close at hand should the unexpected occur.

e-Boost is a product of Pioneer Power Mobility, a division of Pioneer Power Solutions (NASDAQ: PPSI), who are experienced providers of off-grid resiliency solutions like Distributed Power and Back-up Power Generation Assets throughout the USA.

Products and Services

Our T&D Solutions business provides equipment solutions that help customers effectively and efficiently manage their electrical power distribution systems to desired specifications. Our Critical Power business provides engine-generator sets and controls, and is supported by our nationwide field service organization for emergency standby power systems and distributed generation applications.

Introducing E-Bloc

As the deployment of high-powered EV chargers continues to grow across the US, the issue of connecting them into a facility’s existing electrical system becomes a major problem. Level III EV chargers consume a lot of power, installing five (5) of them can easily add 2000 amps to the existing electrical service infrastructure. Modifying or replacing the service entrance equipment can be very costly and limited by space constraints.

Introducing E-Bloc!  E-Bloc is a pre-packaged service entrance switchgear solution that supports the rapid deployment of commercial EV infrastructure. E-Bloc is installed outdoors between the utility transformer and the facility’s existing service equipment.  It directly feeds both the EV chargers and the facility’s existing load.  No Modification is required to the building’s existing service entrance equipment.

E-Bloc Microgrid!  E-Bloc can also be equipped with the ability to support various distributed energy resources, solar, energy storage, engine generators and others. The various distributed energy resources do not have to be initially deployed but can be installed as budget allows. E-Bloc can have up to 500kW of energy storage on the same skid as the switchgear, further simplifying the installation process. The microgrid controls can be tailored to provide a basic level of Microgrid functionality or complete automated real-time controls (data acquisition, monitoring, control, and optimization).

Please click on the links below for a quick introductory video or download our one-page flyer. If you have any questions or would like to set-up an E-Bloc webinar, please send us an email at
e-blocsales1@pioneerpowersolutions.com.

Latest News

Pioneer Power to Host 2024 Third Quarter Financial Results Conference Call on Monday, November 18, 2024 at 4:30 p.m. ET

Pioneer Announces Sale of its Pioneer Custom Electrical Products, LLC Business Unit, Including E-Bloc

Pioneer Files Quarterly Report on Form 10-Q for the Quarter Ended June 30, 2024; Reiterates Full Year 2024 Guidance

Pioneer Announces Filing of Quarterly Report on Form 10-Q for the Quarter Ended March 31, 2024

Pioneer Power and SparkCharge Charge Ahead with Technology Alliance, Boosting Market Potential

Pioneer Power Announces Filing of Annual Report on Form 10-K for the Fiscal Year Ended December 31, 2023

Pioneer Announces New E-Bloc Orders Totaling $7.2 Million in the Month of June for Multiple Infrastructure Markets – Airports, Military Installations and EV Charging

Pioneer Announces e-Boost Order of $7.1 Million from One of the Largest U.S. School Districts

Pioneer Power Receives $5 Million Order from Major U.S. Metro Transit Authority for EV Bus Charging at Multiple Sites

Pioneer Achieves 51% Year-Over-Year Increase in Revenue, Reaching $40.8 Million

Pioneer Power Enters $2.4 Billion Residential Power and EV Charging Market with HOMe-Boost, an Integrated Distributed Generation and EV Charging Product for U.S. Homeowners

Pioneer Power to Host 2023 Fourth Quarter and Year-End Financial Results Conference Call on Monday, April 1, 2024 at 5:00 p.m. ET

Pioneer Power Launches New Modular, E-Bloc Charge Port Series and Immediately Books Initial Orders Valued at More Than $2 Million

Pioneer Power Partners with NOMAD Transportable Power Systems to Launch New Zero-Emission, Mobile EV Charging Platform and Re-charging Solutions

Pioneer Power Announces e-Bloc and Related Product Orders in Excess of $10 Million

Pioneer Power Announces e-Boost Orders Totaling $3.1 Million

Pioneer is Providing Their E-Bloc Solutions for Two of the 8 Projects that Signal the Future of Microgrids | T&D World

Pioneer to Provide e-Boost Solution to Launch MACAW Energies’ Low Carbon LNG to EV Charging in Texas

Pioneer’s Third Quarter Revenue Increases 99.1% to a Record $12.4 Million; Grows Profitability to $0.10 in Quarterly EPS

Pioneer Power to Host Third Quarter Financial Results Conference Call on Wednesday, November 15, 2023 at 9:00 a.m. ET

Webcast: Virtual Presentation at the iAccess Alpha’s Top 10 Best Ideas Conference

Pioneer Power’s Momentum Continues, Winning $7 Million in E-Bloc and Other Related Equipment Orders during August, Supporting Increased Growth Expectations for 2024

Pioneer Power to Participate at Upcoming Conferences in September

Pioneer Power Increases Revenue 149% during the Second Quarter to a Record $12.1 Million; Gross Profit Increases to $2.7 Million, Achieving a 22% Gross Margin

Pioneer Power’s e-Boost to Support Fairfield, California’s Municipal Electric Bus Fleet

Pioneer Power to Provide E-Bloc Solution to Support Rove Full-Service EV Charging Centers in California

Pioneer Power to Host Second Quarter Financial Results Conference Call on Monday, August 14, 2023 at 5:00 p.m. ET